Muswellbrook Project - w/- BHP Billiton
BHP Billiton Vehicle Workshop - Access Doors.
10 Access Doors sliding vertically up the face of the building.
Each door is 13m wide x 9m high and all doors have 5 safety beams.
All doors are controlled from a central PLC Controller however in the event of power failure each door can be lifted manually.
Project Design Time - 30 days
Construction Time - 3 weeks
Installation Time - 8 weeks
Commission and Test - 2 weeks
Project cost - AUD $500,000.00
|